With the help of generous donations from ANDOC, the following projects were completed between December 2018 December 2023:
Purchase of land for the school and construction of 17 classrooms - fulfilling the state requirements described at left.
In April 2023, construction began on a 2-story building with staircase for 4 additional classrooms, which ANDOC is also just about able to fund.
After completion of this building, a total of 17 classrooms will be available to accommodate up to 350 students.
As a result of the corona pandemic, the number of students is currently still significantly reduced. (260 instead of 350 before the pandemic).
Since a reasonably sustainable economic basis can only be achieved with a number of students of around 350, ANDOC continues to support the NEBS with ongoing financial contributions (as was the case during the lockdown times).
If it is foreseeable that, due to the great need for quality education for needy and underprivileged children, the number of students to be admitted to the NEBS will exceed the current possible maximum of 350, it is our concern to also financially support a corresponding expansion of the school buildings.
For additional classrooms, the 2-story building could be increased by 3 floors.
Therefore, we are asking for financial contributions from anyone we could illustrate the importance of the NEBS school project.